• SEBINO | Fire and Security

  • EVAC Systems – Sound evacuation

    Ad to EVAC system maintenance, Sebino performs the following tests each six months:

    • General visual inspection of the system status;
    • Operational inspection of all the equipment;
    • System intelligibility inspection (1 time per year)
    • Recovery of all non-operating equipment;
    • Revelant reports